Commissioning & Certification

Commissioning confirms whether an installed ventilation system is delivering the airflow it was designed for. We measure, adjust and record the results, so performance is documented rather than assumed, and the information needed for handover is in place.

What Commissioning Includes

Every system we install is commissioned before handover. The same process is available for systems installed by others.

Airflow Measurement

Measuring supply and extract airflow at each terminal using appropriate instruments.

System Balancing

Adjusting fan speeds and terminals until measured rates align with the design values.

Controls Verification

Checking that controls, boost functions, sensors and any summer bypass operate correctly.

Fault Identification

Identifying and recording issues found during testing, such as restrictions, leaks or incorrect settings.

Commissioning Sheets

Recording design and measured airflow rates, settings and test conditions for each terminal.

Part F Completion Documentation

Providing the applicable completion information for Building Regulations purposes, where required.

How We Commission a System

  1. Pre-commissioning checks – confirm the installation is complete, filters are fitted and ductwork is connected and sealed.
  2. Set up the unit – configure controls and initial fan speeds to suit the design.
  3. Measure – record airflow at every supply and extract terminal for continuous and boost operation.
  4. Balance – adjust terminals and fan speeds, then re-measure until rates align with the design values.
  5. Verify – check controls, boost, sensors and bypass functions.
  6. Record and hand over – complete commissioning sheets and explain the system to the client or building manager.

A Note on Certification

“Certification” can mean different things. To avoid confusion, this is what our documentation is, and what it is not.

Our Commissioning Records

The commissioning sheets and certificates we issue document the tests we carried out and the results we measured. They are our own company records of the work.

Statutory Approval

Building Regulations approval is given by the relevant building control body, not by us. Where applicable, our documentation supports that process.

Third-Party Certification

Our records are not independent third-party certification. If your project requires certification from another organisation, this needs to be arranged separately.

Independent Checks of Existing Installations

If your system was installed by someone else, we can check it independently of the original installer as a separate service. We measure what the system is actually delivering, compare it with the design or applicable rates, and give you a written summary of what we found.

When a check can help

Frequently Asked Questions

For many new installations, particularly in dwellings, Approved Document F expects ventilation systems to be commissioned and the results recorded. Even where it is not required, commissioning is the only way to confirm the system is delivering its design airflow.

No. Our certificates and records document the testing we carried out. Building Regulations approval is given by the relevant building control body; our documentation supports that process where applicable.

Yes. We can commission or re-commission systems installed by others, and we will record any issues that prevent the system from reaching its design airflow.

We record the measured results and the likely reasons, such as restrictive ductwork or an undersized unit, and explain the options for resolving them before the system is signed off.