Design & Engineering

Good ventilation performance starts on paper. Our mechanical engineers base every design on calculation, so the system specified is one that can actually be delivered, balanced and maintained once it is installed.

A System Designed as a Whole

A ventilation system is more than a unit and some ducting. Airflow rates, duct sizes, fittings, filters, terminals, controls and the fan itself all affect each other.

Our designs look at the complete system, from the outside air intake to every supply and extract terminal, so that each part is selected with the others in mind.

Our 6-Stage Design Process

Every design follows the same structured sequence, whether it is a single dwelling or a multi-zone commercial system.

1. Establish Design Airflow

Determine continuous and boost airflow rates for each room from occupancy, room use and applicable requirements.

2. Calculate Velocities & Pressure Drops

Calculate duct velocities and pressure losses through ductwork, fittings, filters, grilles and other components.

3. Size Ductwork & Select Fan Duty

Size the ductwork and select the unit, fan or AHU to deliver the design airflow at the calculated system pressure.

4. Evaluate Sound & Vibration

Assess noise and vibration risks and specify attenuation, mountings and unit positions where required.

5. Check Interfaces

Confirm that controls, electrical supplies and condensate drainage are coordinated with the rest of the building.

6. Plan Installation & Commissioning

Produce an installation and commissioning plan so the system can be built, tested and balanced as designed.

What the Design Stage Covers

Involve us early.

Space for units, duct routes and access for maintenance is much easier to plan before walls and ceilings are finished. Share your drawings at an early stage and we can advise on what the ventilation system will need.

Frequently Asked Questions

Because the maximum figure is usually achieved with almost no resistance. Once the unit is connected to real ductwork, filters and terminals, it delivers less air. Selecting at the calculated system pressure avoids undersized systems that run noisily at high speed.

Designs take account of the requirements that apply to the project, such as Approved Document F for ventilation in dwellings, along with the client’s brief and the manufacturer’s data for the equipment selected.

Yes. For existing buildings we usually start with a survey of the current layout and any existing ventilation, so the design reflects what is practical on site.

As early as possible. Ventilation needs space for units, ductwork and access, and these are easier and less costly to allow for at design stage than after construction has started.